You are required to read and agree to the below before accessing a full-text version of an article in the IDE article repository.

The full-text document you are about to access is subject to national and international copyright laws. In most cases (but not necessarily all) the consequence is that personal use is allowed given that the copyright owner is duly acknowledged and respected. All other use (typically) require an explicit permission (often in writing) by the copyright owner.

For the reports in this repository we specifically note that

  • the use of articles under IEEE copyright is governed by the IEEE copyright policy (available at http://www.ieee.org/web/publications/rights/copyrightpolicy.html)
  • the use of articles under ACM copyright is governed by the ACM copyright policy (available at http://www.acm.org/pubs/copyright_policy/)
  • technical reports and other articles issued by M‰lardalen University is free for personal use. For other use, the explicit consent of the authors is required
  • in other cases, please contact the copyright owner for detailed information

By accepting I agree to acknowledge and respect the rights of the copyright owner of the document I am about to access.

If you are in doubt, feel free to contact webmaster@ide.mdh.se

A Real-Time Optimization Model for Production Planning in Quarry Sites

Publication Type:

Conference/Workshop Paper

Venue:

International Conference on Industrial Engineering and Applications


Abstract

A quarry site is used to produce gravel with different granularities based on the customer's needs. The production process consists of different stages that need to be planned in order to achieve high productivity and low cost. During the operation of a quarry site, the operating parameters change, and the site productivity could be affected, therefore, a replanning of the production is needed. This paper presents a real-time optimization model for production planning in a quarry site. The optimization model consists of three modules, a productivity monitoring module, a simulation model, and an optimization algorithm. The productivity monitoring module produces the site productivity based on the current operating parameters of the quarry site. Once the site productivity reaches a specific threshold, the optimization algorithm is run on an updated simulation model to find the optimal values of the site parameters. The proposed real-time optimization model is applied to a real quarry site simulated on a high-fidelity simulator. The case study shows that the proposed optimization model can effectively optimize the productivity of the quarry site and hence reduces the wastes and improve environmental sustainability.

Bibtex

@inproceedings{Fattouh6179,
author = {Anas Fattouh and Markus Bohlin and Daniel Sundmark},
title = {A Real-Time Optimization Model for Production Planning in Quarry Sites},
month = {April},
year = {2021},
booktitle = {International Conference on Industrial Engineering and Applications},
url = {http://www.es.mdu.se/publications/6179-}
}